Inner South · City of Unley

Asbestos removal Unley

Unley has a mix of heritage homes and inter-war to post-war housing. Asbestos is most commonly found in 1940s–1970s additions to older homes — bathrooms, laundries, eaves and rear extensions.

Why is asbestos found so often in Unley renovations?

Unley is one of Adelaide's most actively renovated suburbs. Almost every significant renovation on a pre-1990 home requires an asbestos audit before work starts. The most common finds are wet-area sheeting, eave linings and vinyl floor adhesives.

What order should an Unley renovation follow?

Do the asbestos steps before the builder's start date is fixed, in this order.

  • Audit: an assessor inspects the rooms being renovated and takes samples. Two to four hours on site.
  • Lab results: two to five business days.
  • Removal quotes: send the audit report to removalists so each prices the same scope.
  • Notification: the chosen removalist lodges the job with SafeWork SA at least 5 days before starting.
  • Removal and clearance: one to three days for most houses, finishing with a clearance certificate.
  • Builder starts: hand the certificate to the builder on day one.

What do the common Unley finds cost to remove?

Found during the auditTypical price
Pre-renovation audit$400–$1,200
Wet-area wall sheeting, one room$1,500–$4,500
Eave lining$60–$110/m²
Vinyl flooring with asbestos adhesive$90–$100/m²
Air monitoring and clearance$400–$2,000

Who is responsible once the builder is on site?

The builder and removalist carry the work health and safety duties. Under South Australian law a house becomes a workplace when refurbishment starts, and the legal duties sit with the contractor doing the work.

Your part as the owner is practical: commission the audit early, pass the report to every trade and keep the clearance certificate with the house records.

Common jobs in Unley

  • • Pre-renovation audits
  • • Bathroom and laundry removal
  • • Eave removal
  • • Floor vinyl and adhesive removal
  • • Full house testing before purchase

Nearby suburbs

Hyde Park · Parkside · Goodwood · Black Forest · Wayville · Millswood

Council: City of Unley

Asbestos service prices for Unley

Asbestos removal in Unley: questions

Is asbestos testing required before renovating in Unley?

Yes — all pre-1990 buildings in SA must be tested before renovation. This is a state-wide requirement, not council-specific.

How long before my Unley renovation should I book the audit?

At least three weeks before the builder's start date. That covers about a week for the audit and lab results, the SafeWork SA notification period and one to three days of removal.

What does a clearance certificate mean for my builder?

It confirms the work area passed a visual inspection and that air monitoring results were below 0.01 fibres per millilitre. Until it is issued, other trades should stay out of the removal area.

Sources

Last reviewed .

Related reading

Get an asbestos quote in Unley

Tell us the job type, property age and suburb. Quote by email within 2 hours (business hours).

Start my quote
Get a free asbestos quote